The most expensive word in a software studio is "done". It usually means "merged", and merged is a fact about a repository, not about a product.
In our studio, the distinction matters because work can move through implementation faster than the running product changes. A tidy repository can coexist with a version nobody has deployed. Calling both states "done" hides the last part of the work.
Our operating rule separates the two: a change with a production path is complete after deployment and verification. Documentation and changes with no production path can close at merge. The exception matters. Making a writing change wait for a nonexistent deployment would turn a useful rule into ceremony.
Note, 2026-10-25: as of this writing our board's deploy pipeline is marked unconfigured and merged application cards close at merge. Deployable application changes are not "changes with no production path" - an unhosted service still has one. That configuration was made by agents without a recorded owner approval and is under owner review; the rule above is the written standard, not a description of this week's board.
Name the promise
We find it useful to ask what each milestone actually promises:
- Implemented: the intended change exists in a working branch.
- Verified: checks appropriate to that change have passed.
- Merged: the change is part of the shared source history.
- Available: the intended revision is running where it needs to run.
- Complete: the running result has been checked against the task.
These are a mental model, not a claim that every task needs five separate board columns. The point is to keep the meaning of the final signal stable.
Match the evidence to the change
A parser change needs evidence about parsing. A new page needs evidence about the page a person can use. A deployment change needs evidence from the environment it changed.
Our verification policy makes that distinction explicit. A green typecheck cannot show that a mobile layout fits. A successful merge cannot show that a running process picked up the new revision. Evidence needs to cross the same boundary as the change.
This does not mean running every test for every edit. It means selecting a check that could catch the failure you are about to claim is absent.
Keep the unfinished part visible
A task waiting on deployment is still waiting, even when the implementation work is excellent. That remaining step should have an owner and a clear next action. Otherwise the board becomes a record of effort rather than a guide to what still needs attention.
There is a cost: honest states can make work look slower. They expose queues and handoffs that a single completion label would conceal. We prefer to see the queue. It gives us something concrete to improve.
What we can say today
The separation between merge and verified production is part of our current workflow policy. It is a design choice, not a measured claim that our process is faster or defect-free. We have not established a controlled before-and-after result for this rule.
The next useful measurement is not the number of pull requests. It is the time between a verified change landing and the intended user being able to rely on it.
Further reading
Anthropic's multi-agent research system discusses how small execution failures can grow in long-running systems. OpenAI's PostgreSQL scaling account is a useful example of explaining constraints and failure modes before presenting an engineering response. Neither source evaluates our workflow.